5/21/2016 11:24 PM | |
Posts: 5225 Rating: (1192)
|
There are some brilliantly made videos that is worth mentioning to those who are starting using TIA Portal. Of those I recommend this one first... The full series of videos can be downloaded.. Individual videos can be reached.. |
5/22/2016 9:08 PM | |
Joined: 5/8/2016 Last visit: 6/30/2022 Posts: 5 Rating: (0) |
William B Thanks for ur suggestions. I get it working, but I didn´t understand how to get rid of MUL instruction. U mentioned its done in panel. Do u have any example? This how I did it: See attached pdf AttachmentRetentive timert.pdf (110 Downloads) |
5/22/2016 9:35 PM | |
Posts: 5225 Rating: (1192)
|
We do the tasks with what we have available. Using M-memory is possible. It can even be set retentive when working from MW0. But the usage of a DB is more optimal. There are many tools available to set values easily while commissioning for example. Structuring is also a big plus. Variables in DBs also process faster in the S7-1200 world. Back to your question.. You do not then after need to port through M-memory. Use DB variable throughout. See the photo hints in the attached ZIP. Does that help you? Is it rating worthy? AttachmentVisual clue_TIME as scaled value.zip (89 Downloads) |
Last edited by: William_B at: 5/22/2016 9:35:57 PM |
|
5/27/2016 11:43 PM | |
Joined: 5/8/2016 Last visit: 6/30/2022 Posts: 5 Rating: (0) |
Thanks for ur info. It was helpful and u get 5 stars! Regards, AttachmentStrul timer.pdf (89 Downloads) |
Follow us on