2/18/2018 2:26 PM | |
Posts: 2 Rating: (0) |
HELLO, AM CONFUSED WITH A PROCESS CAN ANY ONE GIVE A SOLUTION? MY PROBLEM IS AS FOLLOWS "THERE IS 5 TANKS CARRIYING DIFFERENT METERIAL THIS HAD TO BE SHIFTED WHEN IT BECOME FULL TO ANOTHER SECONDORY TANKS THROUGH A SINGLE CONVEYOR,THAT MEANS IF TANK1 BECOME FULL CONVEYOR SHOLD RUN AND ONLY THE VALVE TO SECONDORY TANK1 SOULD OPEN, AND SO ON. CAN ANYBODY HELP ON THE PROBLEM? I THINK IT CAN BE DONE BY ARRAY SHIFTING OF FIFO, TRIED LOT BUT NOTHING WORKS, PLEASE SUGGEST A SOLUTION ------------------------------------------------------------------------------------------ |
Last edited by: Jen_Moderator at: 2/19/2018 9:26:16 AMNew subject after splitting |
|
Follow us on