2/18/2018 2:16 PM | |
Posts: 2 Rating: (0) |
HELLO, AM CONFUSED WITH A PROCESS CAN ANY ONE GIVE A SOLUTION? MY PROBLEM IS AS FOLLOWS "THERE IS 5 TANKS CARRIYING DIFFERENT METERIAL THIS HAD TO BE SHIFTED WHEN IT BECOME FULL TO ANOTHER SECONDORY TANKS THROUGH A SINGLE CONVEYOR,THAT MEANS IF TANK1 BECOME FULL CONVEYOR SHOLD RUN AND ONLY THE VALVE TO SECONDORY TANK1 SOULD OPEN, AND SO ON. CAN ANYBODY HELP ON THE PROBLEM? I THINK IT CAN BE DONE BY ARRAY SHIFTING OF FIFO, TRIED LOT BUT NOTHING WORKS, PLEASE SUGGEST A SOLUTION ------------------------------------------------------------------------------------------ |
Last edited by: Jen_Moderator at: 2/19/2018 9:27:34 AMNew subject after splitting |
|
2/19/2018 9:28 AM | |
Joined: 6/19/2017 Last visit: 9/6/2024 Posts: 8175 Rating: (172) |
Closed cause question posted twice.
|
Follow us on