12/5/2018 9:11 PM | |
Joined: 12/18/2014 Last visit: 12/22/2024 Posts: 34442 Rating: (4294)
|
In attachment a possible solution. The priority selection is made by a completed pumping process. If priority 3 was selected, next priority 1 will start again. AttachmentPump_control_0BA8.Standard.zip (2699 Downloads) |
12/6/2018 10:30 PM | |
Joined: 12/18/2014 Last visit: 12/22/2024 Posts: 34442 Rating: (4294)
|
My heart is too soft ..... Here is the version with control over pressure. AttachmentPump_control_V2_0BA8.Standard.zip (2303 Downloads) |
This contribution was helpful to1 thankful Users |
12/6/2018 11:00 PM | |
Posts: 4 Rating: (0) |
Thanks a lot for your great help. You are my boss now |
This contribution was helpful to1 thankful Users |
12/7/2018 4:55 AM | |
Joined: 12/18/2014 Last visit: 12/22/2024 Posts: 34442 Rating: (4294)
|
Hello Haffy, you're welcome.... |
1/29/2020 3:41 PM | |
Posts: 1 Rating: (1) |
thanks for your Help ;) i need this file but i cann't open it, do you know how can i open the is fIle ?? thank |
Follow us on