5/15/2012 2:47 PM | |
Joined: 10/10/2005 Last visit: 10/18/2024 Posts: 1921 Rating: (136) |
Hello, you can call the first Graph (FB1) and his instance DB in the Permanent pre-instructions of the second Graph (FB2). See the example of the both screenshots Graph_01 and Graph_02. With best regards Attachmentgraph.zip (285 Downloads) |
This contribution was helpful to1 thankful Users |
3/10/2016 4:21 PM | |
Joined: 9/3/2014 Last visit: 3/13/2019 Posts: 4766 Rating: (122) |
New question published by jimcale is split to a separate thread with the subject Making 5 FB in Graph. Best regards |
Follow us on