12/26/2017 10:39 PM | |
Posts: 12 Rating: (0) |
Hi what is the best practice implementing transformer BI into DIGSI 5? what about using external trip for gas trip and temperature trip. |
12/27/2017 5:30 AM | |
Joined: 4/23/2010 Last visit: 12/31/2023 Posts: 8092 Rating: (877) |
Hello Valendil1403, Siprotech 5 is protection device & DIGSI 5 is a engineering tool. Depending upon protection requirement user need to select Siprotech relays. User can not interface external trip switches like gas switch or temperature switches as interlocking poles. User needs to use those as BI depending upon the type of relay selection. Please refer attached file for more information. AttachmentSiemens SIPROTEC Relay_Selection_Guide_A1_en[1].pdf (172 Downloads) |
12/27/2017 12:33 PM | |
Posts: 12 Rating: (0) |
Hi We are using a SJ85 - P1J221861. And alle the transforer protection switches are connected to the expansion module. -bucholtz, temeprature |
Follow us on