9/25/2015 1:13 PM | |
Posts: 767 Rating: (69) |
Hello guys, are the sheets in CFC (1 to 6) run at the same time or first sheet1 is executed and last sheet 6? Thanks guys. Regards |
9/25/2015 1:35 PM | |
Posts: 567 Rating: (107) |
Hi, the blocks on the Chart run sequential. Have look in the runtime Group of the Chart. There you can see which block runs at first and so on. Have look at PCS 7 compendium part A chapter 7.2.4 "Run Sequenz". https://support.industry.siemens.com/cs/ww/en/view/107196780 |
Follow us on