8/28/2019 8:20 AM | |
Joined: 5/3/2017 Last visit: 4/19/2024 Posts: 673 Rating: (216) |
Hello Borrina, why do you want to optimize the run sequence of the OB100? The OB 100 is not called cyclically. More Information about the Organization Blocks you can find in the manual System Software for S7-300/400 System and Standard Functions. And in the section 1.26 you can find the description of the Startup Organization Blocks (OB100). With regards |
Follow us on