(0)| 11/29/2014 10:25 AM | |
|
Posts: 54 Rating:
|
Dear Sirs , We have a project that we want to use S7-400H .My question is about designing Network .The qustion is about,is it necessary that (between Switch Scalance and Patch panel use two solution?i mean that designer used one bus with Switch convertor to Patch panel and also one bus from Switch scalance to Patch panel).I attached one Picture of my Configuration.I dont understand why should be used both bus? Attachment1.pdf (80 Downloads) |
| 11/29/2014 1:05 PM | |
|
Posts: 54 Rating:
|
I hope one Person help me!What should i do? |
| 11/30/2014 11:35 AM | |
|
Posts: 54 Rating:
|
Is there one person here,which can answer to my questions? |
| 12/1/2014 8:01 AM | |
|
Posts: 54 Rating:
|
Dear sir rusli, I attached Page 2 of this configuration.As matter of fact i could not under stand whay designer use between 2scalance and patch panel 2 line Fober optic and also 2 fiber optic convertor to patch panel ?because after patch panel we have just cleint section,Is it neccessery we use 2line From scalance +++ 2line from Switsch with Fiber Optic converter.I think that there is no reaseon for using 2line from Scalance to Patch panel.Because all client after Patch panel can Data from Switch with 2Fiber Optic recieve.Please give me help ... BR Attachment2.pdf (69 Downloads) |
| 12/1/2014 8:17 AM | |
|
Posts: 54 Rating:
|
Dear sir , this is the last page of our configuration ,could you please tell us what software according to our configuration we need? BR Tajallaee Attachment3.pdf (71 Downloads) |
| 12/1/2014 1:07 PM | |
|
Posts: 54 Rating:
|
i hope one person can help me. |
| 12/2/2014 8:21 AM | |
|
Posts: 54 Rating:
|
I hope that i recieve soonest my response. Best regards Vahid Tajallaee Plc Programmer |
Follow us on