Industry Online Support
Technical Forum
10/4/2007 5:52 PM | |
Joined: 9/23/2005 Last visit: 4/17/2024 Posts: 4325 Rating: (1424) |
Hi, I think that is bether break your problem in parts. To time measuring there is a gook FAQ: http://support.automation.siemens.com/WW/view/en/26116970 |
Denilson Pegaia |
|
10/5/2007 7:53 AM | |
Posts: 2348 Rating: (263) |
Also you can use OB1x to make time-driven event (ex. every day at 8am) - but you'd better syncronize CPU with something. |
Follow us on