7/2/2013 5:52 PM | |
Joined: 7/8/2009 Last visit: 9/5/2020 Posts: 1973 Rating:
|
First, Its nice to read all of above posts.. I feel like we all are sitting at one round table and talking about pasts and all... Now, why only for PLC??? I would like to write about my first drive commissioning Well, I studied so many times and checked panels at our office but never commissioned and my first commissioning was for crane in one of the steel plant very far from my place It was a bit exciting for me because I was commissioning alone and for the first time I went that far - but guess what For in my first commissioning, when we gave 3 phase supply to drive, pre charging resistor blew up... ![]() ![]() Then, I commissioned so many drives, and then I went abroad first time ![]() ![]() I would like to thank AMAZINGAHMEDfor starting such a wonderful thread which refreshed nice memory ![]() Regards, Devesh Vithani |
Last edited by: Vithani at: 7/2/2013 6:00 PMI dont Like people driving Fast, thats the reason I overtake them ;) |
|
This contribution was helpful to
3 thankful Users |
7/2/2013 6:05 PM | |
Joined: 8/27/2006 Last visit: 11/24/2020 Posts: 706 Rating:
|
Thank you for sharing those nice (not so nice for you at the past) memories. But looking at your consecutive drive blows, do you think that you should have fed the 3 phase to the drive from the output side (with incandescent lamps in the way) for the capacitors to charge at first?
|
The more you know, The more you know that you don't know |
|