3/17/2017 12:34 PM | |
Joined: 7/9/2015 Last visit: 9/25/2024 Posts: 3945 Rating: (586) |
Hi, you can´t enlarge the work memory of a S7-1200 and that is not decisive for cycle time of your PLC. Cycle time is depending on instructions you use and if Blocks are optimized or non optimized. Please check the following entry: Programming Guideline and Programming Styleguide for S7-1200 and S7-1500Regards, Towome |
|
|
Follow us on