Industry Online Support
Technical Forum
3/29/2020 7:19 AM | |
Joined: 3/8/2019 Last visit: 4/8/2021 Posts: 2 Rating: (0) |
Hello, I am new here and PLC's. I am trying to create a project. When press the push button once Q1 works for 12 seconds and Q2 works at the 5th second and Q2 stops at the 10th second. How can I create this project? I attached the project I was trying to do. I will be glad if you can help. I1 = Stop Button I2 = Start Button
AttachmentSequantial Work.zip (72 Downloads) |
3/29/2020 8:10 AM | |
Joined: 12/18/2014 Last visit: 9/22/2024 Posts: 33817 Rating: (4201)
|
Hello unsalican, at first welcome to the forum. In attachment a example. Try this.... AttachmentSequantial Work_V2.zip (89 Downloads) |
This contribution was helpful to1 thankful Users |
Follow us on