Industry Online Support
Technical Forum
9/7/2020 6:51 AM | |
Posts: 1 Rating: (0) |
I have similar problem, simotion d 425 is starting normally but the ready led is blinking green off and on and system is not ready for use ------------------------------------------------------------------------------------------ |
Last edited by: Jen_Moderator at: 09/07/2020 06:52:46New subject after splitting |
|
9/7/2020 7:15 AM | |
Joined: 5/12/2006 Last visit: 9/20/2024 Posts: 22365 Rating: (3012)
|
RDY = Green Blinkinh means that no project is loaded on the drive and state is first commissioning |
Follow us on