5/16/2009 2:31 PM | |
Joined: 7/16/2006 Last visit: 1/2/2024 Posts: 1502 Rating:
|
Hi Hi If the programming device is no longer coming to the PLC, the PLC should be with the rotating switch "S4" delete. With the rotary switch is very time critical. Even if the man has often made it prepares problems. Read the document here. Makers "step by step" through. https://www.automation.siemens.com/doconweb/content.asp?item=3141&cd=sinumerik_simodrive_10_2008_e&scope=all Open: --> Start-Up Guide 840D/810D/611D (O.K. you have 810D, but this is the thame procedur) Side 42 --> PLC general reset. Please try it with this Informations. (Perhaps you must make this 3-10 x) After reset, you can transfer the PLC-Programm with Field-PG or so. |
Karl |
|
Follow us on