4/26/2024 1:00 PM | |
Joined: 2/1/2010 Last visit: 10/3/2024 Posts: 150 Rating: (71) |
If you have 2 single stations which are not configured as redundant single station and also need to have the same hierarchy assignments, then each must be in its own separate project of the multi-project and plant hierarchy should be synced between all projects. Then each SS OS will have its own assignments, graphics and compilation. |
If my post helped you, please rate. Thanks. |
|
Follow us on