5/26/2008 1:50 PM | |
Posts: 2348 Rating: (264) |
Check Area Pointers first (think it would be enough), PLC jobs then if required. |
5/26/2008 3:31 PM | |
Joined: 4/10/2006 Last visit: 10/18/2024 Posts: 934 Rating: (2) |
Ok Aret.... I tried to read the manual wincc but I do not understand Attachmentwincc_set.pdf (167 Downloads) |
Setting of my PG M6 Siemens |
|
5/26/2008 4:12 PM | |
Joined: 2/5/2007 Last visit: 9/9/2023 Posts: 101 Rating: (10) |
Here's a programexample. It also contains daylight saving time (summer/winter time). http://support.automation.siemens.com/WW/news/en/26961516?Datakey=24359846 Regards -- Daniel |
Last edited by: dande74 at: 5/26/2008 4:12 PM |
|
5/26/2008 5:42 PM | |
Joined: 9/23/2005 Last visit: 10/18/2024 Posts: 4350 Rating: (1448) |
Hi, take a look at FAQ 24104104: How do you synchronize the date and time between an operator panel and an S7-300/S7-400 controller with WinCC flexible? http://support.automation.siemens.com/BR/view/en/24104104 |
Denilson Pegaia |
|
Follow us on