3/6/2020 6:10 AM | |
Joined: 5/23/2017 Last visit: 4/23/2024 Posts: 34 Rating: (0) |
Thank you all for your helpful replies. Luckily, the problem has been solved. From the manual I read: Only one job at a time can be triggered by the "GET" and "PUT" instructions over a configured S7 connection. It is not possible to trigger multiple jobs simultaneously by the "GET" and "PUT"instructions over a configured S7 connection. The "GET" and "PUT" instructions can only be called sequentially, in other words one after the other. A job is triggered only when the previous job is completed. My program before had simultaneous job requests to PUT/GET blocks that's why there was an error. After interlocking the job requests: GET block job request first, then activate PUT block job request when the GET block job done bit is activated. Please refer to attached manual. Thanks! Attachmentput_get_sequencer_s7-1200_en.pdf (128 Downloads) |
Follow us on