3/16/2015 3:28 PM | |
Joined: 5/28/2008 Last visit: 9/11/2024 Posts: 1343 Rating: (141)
|
We're talking about this: https://support.industry.siemens.com/cs/ww/en/36932465/40763449867
For the inputs you need to connect the M from the 24V at the 1M Pin. Functional Earth is only to connect to the Pins with the responsible symbol. |
Follow us on