10/8/2024 9:41 AM | |
Joined: 4/29/2015 Last visit: 10/14/2024 Posts: 10 Rating: (0) |
Hi, Myst. In a PC S7 project (v9.1) I have 2 PLCs (410H with a CP443-1 each one) and two OS Servers (master and backup). I have to add a new AS 410E. My idea is not use a CP443-1. I configure a S7 link in NetPro from X8 port with OS servers. But I'm not sure that I will have any problems with time synchronization errors showed in OS. How must I configure time synch in AS (AS time slave)? Thanks in advance ------------------------------------------------------------------------------------------ |
Last edited by: Moderator_Lan at: 10/08/2024 10:22:02New subject after splitting |
|
10/14/2024 2:14 PM | |
Joined: 8/28/2014 Last visit: 10/18/2024 Posts: 21 Rating: (1) |
Hi I recently used this document. even through I used a central time clock, it has all the different scenarios explained. Br,
Attachmentps7tsy_b_en-US_V91.pdf (4 Downloads) |
Follow us on