2/10/2025 7:43 AM | |
Joined: 3/14/2008 Last visit: 9/11/2025 Posts: 2216 Rating:
|
Hi, Maybe you can share some additional screens like the LI_ERR_STATE I/O. If you have configured control strategies, you need to set PARAM to TRUE for one cycle. This is used to check control strategy and setpoints (Validation). |
If I could help you, you can use the RATE button. Thank you. |
|
Follow us on