6/18/2011 1:36 PM | |
Posts: 1 Rating: (0) |
We are trying to upgrade from PSC 7 V6.0 to V7.1, what are the software upgrades we have to purchase?? Igot a suggestion for following package: - 6ES7651-5AF17-0YE5 [SOFTWARE,UPGRADE PACKAGE ENGINEERING( AS/OS: PO UNLIMITED)] - 6ES7658-2BX17-0YE0 [SOFTWARE,UPGRADE PACKAGE OS SERVER FROM V6.X TO V7.1] S7-1613 SW FOR FAIL SAVE S7-COM;] Splitted from PCS 6.1 upgrade to 7.1. |
Last edited by: O_Moderator at: 6/21/2011 8:03 AMnew subject after splitting |
|
6/25/2011 12:32 PM | |
Joined: 9/6/2008 Last visit: 5/7/2022 Posts: 1121 Rating: (86) |
Hi True You will have to upgrade the software in two parts, Licence and the software. If you can give us your system configuration we can tell you exactly what you will require. If you have a server client architecture then you will have to upgrade your server, client, and your ES. Note that if you have userdefined software or pictures may get reset during the upgrade. Have fun.... |
Jazz |
|
Follow us on