5/10/2023 3:11 PM | |
Joined: 6/18/2021 Last visit: 10/13/2024 Posts: 30 Rating: (0) |
Dear sir , I'm having one program for cooling tower make-up water pump ,Wich controls 3 Pump, one running two standby,at time only one pump should be run Time scheduled for pump changeover requirements is as follow Pump 1- Monday Tuesday Pump 2- Wednesday Thursday Pump 3- Friday Saturday Sunday And Actually I'm having issue related to time scheduled logic what to set on weekly timer block And also kindly please suggest me any other changes nead to do Thanks regards Paigambar Momin AttachmentPUMP CONTROL.zip (427 Downloads) |
Follow us on