7/1/2021 3:48 PM | |
Joined: 10/11/2006 Last visit: 9/18/2024 Posts: 5906 Rating: (804)
|
Hello, depending on the CU you use, the parameter are described in the list manual. https://support.industry.siemens.com/cs/ww/en/view/109782301 https://support.industry.siemens.com/cs/ww/en/view/109782287 |
With best regards, |
|
7/2/2021 7:35 PM | |
Joined: 1/14/2014 Last visit: 6/2/2024 Posts: 112 Rating: (1) |
|
7/5/2021 11:12 AM | |
Joined: 10/11/2006 Last visit: 9/18/2024 Posts: 5906 Rating: (804)
|
Hello, because P627 there is function diagramm 8017 in the list manual. Because motor commissioning: It is described in the manual, it is not necessary to set every parameter manually. https://support.industry.siemens.com/cs/ww/en/view/10978286 5.3 Preparing for commissioning 5.3.1 Collecting motor data 5.3.3 Converter factory setting 5.4 Quick commissioning using the BOP-2 operator panel |
With best regards, |
|