4/22/2021 2:47 PM | |
Joined: 10/10/2005 Last visit: 4/18/2024 Posts: 1917 Rating: (132) |
Hello Geordie_kegs, the STEP 7 V5.6 project must be migrated in TIA Portal V16 first with the migration function of TIA Portal. TIA Portal is an other environment as STEP 7 V5.6. Please see also the information and recommends of the FAQ: What are the requirements for migrating a STEP 7 V5.x project to STEP 7 Professional (TIA Portal)? With best regards |
4/22/2021 11:23 PM | |
Joined: 3/28/2015 Last visit: 5/10/2024 Posts: 721 Rating: (213) |
Hello, Perhaps the following topic might help: Combined configuration with WinCC (TIA Portal) and STEP 7 V5.x The documentation includes a description for using a “Device proxy PLC” as of WinCC V13 (TIA Portal) |
Eng.Mohamed Ibrahim |
|
Follow us on