11/20/2024 9:23 AM | |
Joined: 10/4/2023 Last visit: 12/18/2024 Posts: 1 Rating:
|
Dear All, As per plant requirement , we need to have redundant PLC processor as well as redundant IM module. Maximum IO count will be 350nos to 400nos. AttachmentTest Architecture.xlsx (299 Downloads) |
Follow us on